[VIDEO] Time-lapse installation bridge pillars

Published on:

October 27, 2020

Commissioned by Dura Vermeer, on Friday October 16th Hapo’s cranebarge the Missing Link was deployed for the transport and installation of the bridge pillars for the newly planned pedestrian and bicycle ‘Prins Claus bridge’ in Dordrecht, the Netherlands. In this brief time-lapse video the installation by the Missing Link is shown.

Facebook | Twitter | LinkedIn | Instagram |

<< Next || Previous >>

See all posts