Transport bridge sections

Published on:

November 30, 2018

Monday October 22nd the H-282 barge was deployed for the transport of two bridge sections which were damaged earlier this year. Bonn & Mees used one of their sheerleg cranes to load the bridge sections onto the H-282 at steel company Hollandia Infra’s shipyard at Krimpen aan den IJssel.

Once loaded the barge set course to SSN’s shipwrecking yard in ‘s-Gravendeel for the dismantling of the bridge sections.

Facebook | Twitter | LinkedIn | Instagram |

<< Next || Previous >>

See all posts